Purpose
Orders needing action.
What you see
- 1Short, Allocated and Not allocated count unfinished rows in view; search, Filters and the column picker narrow the table, and units to make totals at the right.
- 2One row per order, with Order, Product, Quantity, Raw material, Status and Expected; pressing a row opens it.
Manufacturing orders make finished goods from components. Start them in commitments.
Current orders open. Status reveals cancelled history; Include completed shows completed history. Totals exclude cancelled/completed work.
Orders show quantities, material cost, dates and lifecycle. Materials show availability and shortages; Where and when identifies warehouses and lead times.
On Pro, Review capacity reserves resource time for the order. Choose a machine, its duration or saved production rate, and any qualified crew or tooling needed during setup, processing or both. A machine with directional setup shows its required next state. The review lists reserved periods, setup and processing minutes. Open resources for calendars.
For more than one operation, choose Routing with dependencies. Enter the resource and start time for each operation, then add dependencies with minimum lag and optional maximum wait. The review checks those exact start times; it does not move operations for you.
What to do
On Pro, Plan shared inputs reviews 2 to 8 orders against up to 32 ingredient lots. Reserve ingredients protects reviewed quantities without moving stock. Release remaining reserves releases the quantities shown; refresh after production. Use Check submitted action after an interrupted submission.
- Open a row to reach the order's own page; read-only access suffices.
- While confirmed, edit Allocated on a raw material row, or press Auto-allocate. The result shows allocations and remaining shortages.
- Press Add to bench to stage a shortfall at the default supplier. The cell becomes On the bench. A missing supplier prevents this action.
- Press Mark as confirmed, Mark as in production or Mark as completed. Review the consequence in its drawer. A blocked action names its reason, such as quantity not fitting the batch or materials needing allocation.
- For a drafted quantity that does not fit the batch, press the Round to button, which names the next whole batch quantity.
- For orders without reviewed capacity, Record build consumes components and receives finished goods at the manufacturing location. Managed production uses Production progress → Record finished output.
- Press Move finished goods, on a completed order whose shipping warehouse differs from where it was made, to draft one transfer order for the goods.
- Press Cancel on a drafted or confirmed order and confirm its Smart Replenishment consequence. Reactivate returns a cancelled order with a recorded batch size to Drafted.
On Pro, press Check availability, review the reserved periods, enter a reason and press Reserve capacity. Capacity reservation does not verify materials or create finished stock. To release a reservation, choose Cancel reservation and enter a reason; a routed reservation is cancelled as one group. Add resource and Edit resource manage available periods, downtime, qualifications, product rates and directional setup transitions. Editing a resource retains its other periods and product rates. Rates use units or grams per hour. Changed units require a new rate.
In Production progress, select an action, observed UTC times and a reason. Press Review action, then record it. Running operations have no assumed finish; frozen or observed operations cannot be cancelled. After completion, inspect constraints and Confirm progress. If confirmation is interrupted, choose Check submitted action. Observations do not create stock or change expected delivery.
In Production progress, choose Reschedule remaining work. Enter future UTC starts for untouched, unfrozen operations. Check routing waits, then Review new times. Review the finish and resource periods, enter a reason and Confirm new times. Resources, rates and durations stay fixed.
In Production progress, choose Record finished output after recording processing. Enter the finished quantity, UTC observation and components used. Gram-based output also needs released input lots, output batch, expiry and assay evidence. Review output shows exact material value and remaining output; enter a reason and Record output. Gram output enters quality hold. Use Check submitted action after an interrupted submission.
For gram-based co-products, open Output policy. Select products, review each dedicated storage capacity, and reconcile input grams with good output and normal loss. Explicitly confirm how normal-loss cost is absorbed. Each portion needs all output quantities, lot custody and measured loss. Review each lot’s material value before recording. Insufficient storage blocks submission; shared tanks and disposal require separate authority.
On a gram component, Shelf life reviews its minimum remaining life for manufacturing use. Unavailable lots retain their physical quantity and show the refusal reason. This requirement applies across orders at that location; it does not certify delivery shelf life.
See Campaigns and sanitation for campaign limits and observed cleanup.
Edit Quantity while drafted, and Change the date once confirmed. Writing requires a write seat. Ask Tightly performs none of these acts.
When it is empty or failed
The manufacturing orders could not be read.
Try again repeats the read.
Make orders start in Smart Replenishment
Start from commitments. No manufacturing orders match means the current filters have no results.
This manufacturing order could not be read.
Reviewed production requires recorded operations and finished output, with resource holds resolved, before Mark as completed becomes available.
Review a process blend
On Pro, Review blend records ingredient quality, output specifications and selected lot quantities. Stock stays unchanged. Quantity units sets product units. Retry saved request recovers missing confirmations.