What it is ​

Lead time is how long a supplier takes, in days, from the day you order to the day the goods land at one of your warehouses. It is the figure the replenishment engine walks against: a line is short when its stock runs out before an order placed today could arrive, so the lead time decides when Tightly asks you to order.

How Tightly decides it ​

For a NetSuite variant with a saved supplier/subsidiary lead time, the matching warehouse uses that scoped value first. An explicitly unknown scoped value stays unknown; it does not inherit a company default. Without that scoped field, lead time resolves in this order: this variant at this supplier and warehouse, then this supplier at this warehouse, then this variant at this supplier, then the supplier's own single figure, then the SKU warehouse default where available, then a source-owned SKU default, and last your company default. The warehouse default uses a Tightly override first, otherwise its preserved imported value. Your default is the number Tightly assumes where nothing more specific is on record; it is the Default lead time under Settings, Planning. A supplier's lead time is per warehouse: the same supplier can take three weeks to one warehouse and five to another, so the supplier faces read the per-warehouse rows, each one the supplier's own figure for that warehouse or else your default. A variant's lead time at a supplier is the most specific level, for the case where one product ships differently from the rest of that supplier's catalog.

The source word, never the number, says which level a figure came from. A figure that is your default carries the words from system; in Variant suppliers a supplier's own figure reads this supplier and a variant's reads this variant at this supplier. Where several warehouses carry a value, a face prints the range as the shortest and the longest figure, as in 21 to 35 days, or one figure when they agree, with each warehouse and its days on hover.

Lead time also sets how far the engine walks. Each line is walked at least 120 days, and where its forecast reaches further, past its own lead time plus your cadence, so a long sea import is covered past the standing horizons.

A supplier's own consistency, not only its average, feeds the buffer the replenishment engine holds: a supplier whose delivery days swing widely earns a deeper safety stock than one who always lands on schedule for the same average lead time. That spread is worked out from the supplier's own purchase order receipts over the last two years, order date to delivery; a supplier with fewer than five counted receipts, or a transfer between your own warehouses, adds no spread to the buffer, because nothing was measured.

The words on the face ​

WordWhereWhat it means
a range in daysSuppliers, The supplier, its Catalog, Variant suppliersThe shortest and the longest figure over the warehouses that carry a value; one figure when they agree
from systemunder a figure, and in a lane of the supplier's Edit drawerYour default stands in; nobody has given this supplier's own
this supplierVariant suppliers, SourceThe supplier's own figure for that warehouse
this variant at this supplierVariant suppliers, SourceAn override for one variant
Not setVariant suppliers; the hover on a dash in SuppliersNo level carries a value
No lead timeSuppliers, the figure rowSuppliers with nothing to show: no lead time at any warehouse and no default set
Lead time not set for {n} variantsThe supplier, Needs a personVariants at this supplier stocked in a warehouse where no level carries a value, so your default stands in

What you can do about it ​

Set your default under Settings, then Planning, in Default lead time.

To change one supplier's lead time, open Suppliers, open the supplier and press Edit. Under Lanes, each warehouse has a Lead time. A lane reading From system uses your default; press Set to give it its own days. A lane with its own days shows a days stepper and Clear, which drops them so your default applies again. Only the lanes you change are saved.

To change one variant's lead time at a supplier, open the variant's suppliers, press the by-warehouse link under the supplier's Lead time, and enter days for a warehouse in Lead time by warehouse. A warehouse reading Not set, inherited takes the level above.

To change a variant's own default for one warehouse, open the variant's Supply pane and press Lead times. In Lead time by warehouse, press Edit default on a warehouse, enter days or leave it empty to restore inheritance, and press Save. More specific supplier settings stay in effect. Supplier terms opens the supplier record or setting the figure came from.

On the supplier's record, Needs a person counts the variants as Lead time not set for so many variants, with Set as its door to the Catalog narrowed to them. A refusal names your warehouses in the server's words:

Locations do not exist:

Glossary line ​

Lead time is how long a supplier takes, from the most specific level on record.